@InProceedings{GarbiLourChag:2015:KiMoPr,
               author = "Garbi, Giuliani Paulineli and Loureiro, Geilson and Chagas Junior, 
                         Milton de Freitas",
          affiliation = "{Instituto Nacional de Pesquisas Espaciais (INPE)} and {Instituto 
                         Nacional de Pesquisas Espaciais (INPE)} and {Instituto Nacional de 
                         Pesquisas Espaciais (INPE)}",
                title = "Kinematic model of project scheduling with resource constrained 
                         under uncertainties",
            booktitle = "Proceedings...",
                 year = "2015",
         organization = "ISPE International Conference on Concurrent Engineering, 22.",
                 note = "{Setores de Atividade: Pesquisa e desenvolvimento 
                         cient{\'{\i}}fico.}",
             keywords = "Gest{\~a}o de Projetos, Gest{\~a}o de risco, Toamda de 
                         decis{\~a}o, Pesquisa e Desenvolvimento.",
             abstract = "Projects represent the principal means of materialization of 
                         products. The inherent complexity of product projects is treated 
                         through the techniques and approaches project management. 
                         Throughout products life cycle the techniques and approaches 
                         project management are mainly involved in the planning, 
                         programming and control of project activities conducted in context 
                         of resource constrained under uncertainties. In addition of 
                         scenarios the complexity of the projects, there are some classes 
                         of products, typical of industries of the defense, aerospace, 
                         telecommunication, software, and biomedicine, which are 
                         problematic for current methods of resource constrained project 
                         planning and scheduling under uncertainty. The existing methods 
                         fail because they suffer from one or more of the following 
                         limitations: focused mainly on the basic RCPSP (Resource 
                         Constrained Project Scheduling Problem) model; dealing with only 
                         one source of uncertainty, mostly in duration of activities; and 
                         do not model uncertainties. This paper presents the kinematic 
                         model of projects scheduling which considering the inherent 
                         restrictions in nature of the projects: precedence among project 
                         activities; uncertainties of the duration of project activities; 
                         and uncertainties in availability of resources for execution of 
                         project activities. The kinematic model of projects scheduling 
                         provides a graph and mathematical model with the advantages: 
                         estimation of the project duration and resources due to 
                         uncertainties; estimation of the uncertainties due to project 
                         duration and resources; improvement of the outcomes of planning 
                         and scheduling of project activities; and assists the dynamics of 
                         projects providing information for collaboration policy of the 
                         durations and resources between project activities and between 
                         different projects. This article describes the Resource 
                         Constrained Project Scheduling Problem under uncertainties, 
                         discuss previous work on planning under uncertainty, and 
                         presentation of the kinematic model of projects scheduling with 
                         resource constrained under uncertainties along with a small 
                         example of implementation.",
  conference-location = "Delft",
                  doi = "10.3233/978-1-61499-544-9-71",
                  url = "http://dx.doi.org/10.3233/978-1-61499-544-9-71",
                label = "lattes: 1555060330133009 3 GarbiLourChag:2015:KiMoPr",
             language = "en",
           targetfile = "1_garbi2.pdf",
                  url = "http://ebooks.iospress.nl/volume/transdisciplinary-lifecycle-analysis-of-systems-proceedings-of-the-22nd-ispe-inc-international-conference-on-concurrent-engineering-july-20-23-2015",
        urlaccessdate = "27 abr. 2024"
}


Fechar