title = "Kinematic model of project scheduling with resource constrained
under uncertainties",
booktitle = "Proceedings...",
year = "2015",
organization = "ISPE International Conference on Concurrent Engineering, 22.",
note = "{Setores de Atividade: Pesquisa e desenvolvimento
cient{\'{\i}}fico.}",
keywords = "Gest{\~a}o de Projetos, Gest{\~a}o de risco, Toamda de
decis{\~a}o, Pesquisa e Desenvolvimento.",
abstract = "Projects represent the principal means of materialization of
products. The inherent complexity of product projects is treated
through the techniques and approaches project management.
Throughout products life cycle the techniques and approaches
project management are mainly involved in the planning,
programming and control of project activities conducted in context
of resource constrained under uncertainties. In addition of
scenarios the complexity of the projects, there are some classes
of products, typical of industries of the defense, aerospace,
telecommunication, software, and biomedicine, which are
problematic for current methods of resource constrained project
planning and scheduling under uncertainty. The existing methods
fail because they suffer from one or more of the following
limitations: focused mainly on the basic RCPSP (Resource
Constrained Project Scheduling Problem) model; dealing with only
one source of uncertainty, mostly in duration of activities; and
do not model uncertainties. This paper presents the kinematic
model of projects scheduling which considering the inherent
restrictions in nature of the projects: precedence among project
activities; uncertainties of the duration of project activities;
and uncertainties in availability of resources for execution of
project activities. The kinematic model of projects scheduling
provides a graph and mathematical model with the advantages:
estimation of the project duration and resources due to
uncertainties; estimation of the uncertainties due to project
duration and resources; improvement of the outcomes of planning
and scheduling of project activities; and assists the dynamics of
projects providing information for collaboration policy of the
durations and resources between project activities and between
different projects. This article describes the Resource
Constrained Project Scheduling Problem under uncertainties,
discuss previous work on planning under uncertainty, and
presentation of the kinematic model of projects scheduling with
resource constrained under uncertainties along with a small
example of implementation.",
conference-location = "Delft",
doi = "10.3233/978-1-61499-544-9-71",
url = "http://dx.doi.org/10.3233/978-1-61499-544-9-71",
label = "lattes: 1555060330133009 3 GarbiLourChag:2015:KiMoPr",
language = "en",
targetfile = "1_garbi2.pdf",
url = "http://ebooks.iospress.nl/volume/transdisciplinary-lifecycle-analysis-of-systems-proceedings-of-the-22nd-ispe-inc-international-conference-on-concurrent-engineering-july-20-23-2015",
urlaccessdate = "27 abr. 2024"
}